The following project is illustrative of work performed by Ultimate Corrosion Control for our diverse client base worldwide.

Project Index
Waste Water Tretment - FGD System
Tiger Creek Generation Facility
Mesquite Power Generation Facility
Trimble County Generation Facility
Electro-Coat Paint Tank Reline
E-Coat Secondary Containment

Mesquite Power Generation Facility

Project Description. Several different surfaces of concrete Secondary Containments received flexible, Corrosion Resistant linings to bridge potential movement of concrete and provide Corrosion Barrier to aggressive chemicals such as; Concentrated Sulfuric Acid and Caustic.

Work Performed.

Concrete Process Tanks and Sumps:
Surface preparation- SSPC-SP-13 (NACE6) - abrasive cleaning
Lining: 1/8 “ thick, fiberglass Mat reinforced Vinyl Ester Lining Systems

Secondary Containments:
Surface preparation- SSPC-SP-13 (NACE6) - abrasive cleaning
Lining: high performance, crack-bridging elastomeric lining system KCC Corrosion Control Elastic-Liner II

Process Floors:
100% Solids High builds Epoxy, self leveling/ broadcast flooring Systems

 

Contact Us:
Tel: 248-388-3525 | Fax: 248-393-8391

Information
Send Us E-mail
| Information Request


TeamEnviro
Ultimate Corrosion Control is a proud Member of TeamEnviro,
a buyers group for environmental services. > More Info

Copyright 2002—2010 Ultimate Corrosion Control Inc. All rights reserved.
Trademarks shown are the property of their respective owners.

Design & Hosting byMania Interactive Web Development & New Media Services