ulticor.com | 248-388-3525

Completed Projects

The following project is illustrative of work performed by Ultimate Corrosion Control for our diverse client base worldwide.

Project Index
Waste Water Tretment - FGD System
Tiger Creek Generation Facility
Mesquite Power Generation Facility
Trimble County Generation Facility
Electro-Coat Paint Tank Reline
E-Coat Secondary Containment

Trimble County CT5-CT10 Generation Facility

Project Description. Approximately 180,000 square feet of surfaces was coated following preparation to SSPC-SP6 Commercial Blast Cleaning and SSPC-SP3 Power Tool Cleaning.
Surfaces received Corrosion Protection:

  • Bolted Connection and Surfaces of Field Welds- Zinc Inhibiting Epoxy

  • Piping and Pipe Supports- DTM Urethane Mastic

  • Diffusers- Silicon Aluminum Coating

  • Stacks, Structural Steel and Equipment- Acrylic Latex

Work Performed.

  • Coatings: Exhaust Stocks, Turbine Enclosures, Air Filtration Systems

  • Painting: Equipment, Piping, Structural Steel

  • Architectural Finishes, Painting: Equipment, Piping, Structural Steel,
    Floor Coatings and Sealers, Caulking and Sealants, and Decorative Finishes.

 

Contact Us:
Tel: 248-388-3525 | Fax: 248-393-8391

Information
Send Us E-mail
| Information Request


TeamEnviro
Ultimate Corrosion Control is a proud Member of TeamEnviro,
a buyers group for environmental services. > More Info

Copyright 2002—2010 Ultimate Corrosion Control Inc. All rights reserved.
Trademarks shown are the property of their respective owners.

Design & Hosting byMania Interactive Web Development & New Media Services